MS Project: A Deeper Dive

video-placeholder
Loading...
View Syllabus

Skills You'll Learn

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reviews

4.8 (1,844 ratings)

  • 5 stars
    79.93%
  • 4 stars
    17.35%
  • 3 stars
    2.16%
  • 2 stars
    0.32%
  • 1 star
    0.21%

VT

Dec 23, 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

T

Apr 10, 2022

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

From the lesson

Technology Applications for Scheduling

Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

Taught By

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore our Catalog

Join for free and get personalized recommendations, updates and offers.